RSS Feed

Archive for the ‘Astro Hut’ Category

New Computer

June 11, 2009 by Russ No Comments »

I did not like having to drag my laptop back and forth from the Astro Hut.

So we went looking on E-Bay for a computer and found a
Gateway Model E4600, Pentium4 1.3GHz processor, 512MB RAM, 37GB HD, 250MB Zip, DVD-ROM. 10/100 Ethernet card included!! for 40$.
While its not a top of the line, it is more then what I need!

I dropped in a:

    spare 60 GB hard drive
    a wireless card
    USB card

and am a happy camper!

Now comes the battle of installing all of the astro software from all of the computers…
I have to say that this is going to be one of the better upgrades to the Astro Hut I have done.

 

Where Have I Been?

December 18, 2008 by Russ No Comments »

Astro Hut Snow W
Where have I been?
For the last 3 month we have had nothing but CLOUDS and snow!
Its enough to drive me NUTS!
And with all of the snow we have had its hard to believe that WINTER is still a couple of days away.

And to make matters worse I was working on this site and I dropped the Data Base
( ALL OF THE CONTENT )
And of course I did not have a back up.
I had to use a Google Cached copy to get all of the info back.
What a pain that was….

 

CG5GT and Cables

August 11, 2008 by Russ No Comments »

My CG5GT was getting to be a MESS with all of the cables coming and going.

I have come close to tripping and ripping some of the cables out. THAT would have been BAD VERY VERY BAD!
CG5 cables2
I have 4 cables
2 are for the cameras,
the Orion LPI and the Meade DSI C
2 are for guiding
GPUSB guide port interface and
the Hand Controler.
CG5 cables
So I got a couple of 4 port USB hubs
Now I have to spend some time routing all of them out of the way!
CG5 cables3

 

BackYard Observatory Inside

June 3, 2008 by Russ 1 Comment »

Here are some pictures of the inside
This is the South Wall
BYO SWall

This is the West Wall
BYO WWall

This is the East Wall
BYO EWall

and the North Wall
BYO NWall

One of the plus things about having the 5′ clearance for the rolloff is that I can build 5′ shelves on 3 of the wall.
I wired in 6 plugs 2 on each S,W,N walls can’t have to many plugs!
I have LOTS of work space.